Work out the concrete a footing takes — cubic feet, cubic yards and cubic metres from length, width, depth and the number of footings, with a waste allowance and the bag count if you are mixing on site.

Concrete Footing Calculator

Volume in cubic feet, yards and metres

Footing dimensions

Each dimension has its own unit, so a run that is 40 ft long but 24 in wide can be entered as measured.

Results

Cubic yards

2.20

2.00 before waste

Cubic feet

59.4

1.68 m³

Concrete to order
2.20cu yd
Volume in cubic feet
54.00cu ft
Volume in cubic yards
2.000cu yd
Per footing
9.000cu ft
Waste (10%)
5.40cu ft
Total with waste
59.40cu ft
Order in cubic metres
1.682m³

Bagged Mix — 59.40 cu ft to Cover

Bag sizeYieldBagsWeight
40 lb *0.3 ft³1987,920 lb
60 lb *0.45 ft³1327,920 lb
80 lb0.6 ft³997,920 lb

Counts round up, since a bag cannot be split. The 80 lb yield of 0.60 cu ft is confirmed on manufacturer product data; figures marked * are widely published but were not traceable to a data sheet, so use the yield printed on the bag.

One cubic yard is 27 cubic feet, so the yard figure is always the cubic-feet figure divided by 27 — here 54.00 ÷ 27 = 2.00 cu yd before waste.

Volumes are reported as calculated rather than rounded up, because concrete is a continuous material and the fractional yard is real. Ready-mix is normally sold in quarter-yard increments, so the order quantity will be the next quarter yard above 2.20.

Bag counts are rounded up, since a bag cannot be split. The 80 lb yield of 0.60 cubic feet is confirmed on the manufacturer product data; the 40 lb and 60 lb figures of 0.30 and 0.45 are the widely published values but were not traceable to a manufacturer data sheet, so the yield printed on the bag should take precedence.

All 6 footings are treated as identical. Footings of differing sizes should be calculated separately and added, since the volume of a group is not the volume of an average one times the count unless they genuinely match.

This calculates volume only. It does not size a footing: width, depth and reinforcement follow from the soil bearing capacity, the load carried and the local frost depth, which are engineering decisions rather than geometry.

Reinforcement displaces a little concrete and formwork can bulge outward, so the poured volume rarely matches the nominal one exactly. The waste allowance is what covers the difference, along with spillage and what stays in the chute.

Step-by-Step Calculation

Step 1 — Convert dimensions

Length = 3 ft (already in ft)

Width = 3 ft (already in ft)

Depth = 1 ft (already in ft)

Step 2 — Volume of one footing

3 × 3 × 1 = 9.0000 cu ft

Step 3 — Total for all footings

9.0000 × 6 footings = 54.0000 cu ft

Step 4 — Convert to cubic yards

54.0000 ÷ 27 = 2.0000 cu yd

Step 5 — Add 10% waste

54.0000 × 1.1 = 59.4000 cu ft

which adds 5.4000 cu ft of allowance

Step 6 — Bag counts from the with-waste volume

59.4000 ÷ 0.3 = 198 × 40 lb bags

59.4000 ÷ 0.45 = 132 × 60 lb bags

59.4000 ÷ 0.6 = 99 × 80 lb bags

Result — 2.20 cu yd (59.40 cu ft / 1.682 m³) including waste

Footing Dimensions

A footing spreads the load of a wall or column over the soil. Its volume is simply length × width × depth, but footings are usually specified in mixed units (feet of length, inches of width and depth), so convert everything to feet first.

grade wall footing width 24 in depth 12 in length 40 ft plan view
Example: a continuous footing 40 ft long, 24 in wide and 12 in deep is 40 × 2 × 1 = 80 cu ft, or 80 ÷ 27 = 2.96 cu yd before waste. Local code sets the minimum width and depth below the frost line.

Volume, Then Divide by 27

Footing volume is the simplest calculation in concrete work: length × width × depth. A 4 ft × 2 ft × 1 ft pad is 8 cubic feet. Several identical footings multiply out, so ten footings at 13.5 cubic feet each come to 135.

The step that trips people up is the unit. Concrete is sold by the cubic yard, and a cubic yard is 27 cubic feet — a yard is three feet, so a cubic yard is a three-foot cube and 3 × 3 × 3 = 27. That 8 cubic foot footing is 8 ÷ 27 = 0.2963 cubic yards.

27 rarely divides evenly, which is why footing volumes so often come out as awkward decimals. This calculator reports them as calculated rather than rounding up, because the fractional yard is real concrete — and ready-mix is sold in quarter-yard increments, so the order quantity is the next quarter yard above what is shown.

Concrete Footing Formulas

1. Volume in Cubic Feet

Cubic feet = length × width × depth
4 × 2 × 1 = 8 cu ft

2. Convert to Cubic Yards

Cubic yards = cubic feet ÷ 27
8 ÷ 27 = 0.2963 cu yd

3. Total for All Footings

Total = volume per footing × number of footings
13.5 × 10 = 135 cu ft = 5.0 cu yd

4. Add the Waste Factor

Total with waste = total × (1 + waste ÷ 100)
5.0 × 1.10 = 5.5 cu yd

Common Pad Footing Sizes

Volume for one footing at each size, before any waste allowance:

Footing size Cubic feet Cubic yards 80 lb bags
24 × 24 × 8 in 2.670.099 5
2 × 2 × 1 ft 4.000.148 7
4 × 2 × 1 ft 8.00 0.296 14
3 × 3 × 1 ft 9.000.333 15
3 × 3 × 18 in 13.500.500 23
4 × 4 × 1 ft 16.000.593 27

Note that a 3 × 3 × 18 in footing is exactly half a cubic yard, since 13.5 is half of 27. Sizes that land on clean fractions of a yard are the exception rather than the rule.

Continuous Footings: One Run, Not Many Segments

A strip or continuous footing under a wall is entered as a single footing whose length is the total run. At 1 ft deep:

Total run 16 in wide 24 in wide
20 ft 26.7 ft³ · 0.99 yd³ 40.0 ft³ · 1.48 yd³
40 ft 53.3 ft³ · 1.98 yd³ 80.0 ft³ · 2.96 yd³
60 ft 80.0 ft³ · 2.96 yd³ 120.0 ft³ · 4.44 yd³
80 ft 106.7 ft³ · 3.95 yd³ 160.0 ft³ · 5.93 yd³
100 ft 133.3 ft³ · 4.94 yd³ 200.0 ft³ · 7.41 yd³

Widening the footing from 16 in to 24 in raises the volume by half, which is the single largest lever on the concrete bill — and it is not a free choice, since footing width comes from the soil bearing capacity and the load above. The calculator warns if a footing is many times longer than it is wide while the count is above one, because that usually means a continuous run has been entered as segments by mistake.

Mixed Units Are the Norm, Not the Exception

Footings are rarely specified in one unit. A continuous footing is 40 ft long but 24 in wide and 12 in deep, because the run is a building dimension while the section comes off a detail drawing in inches.

Each dimension here carries its own unit, so that can be entered exactly as measured. 40 ft × 24 in × 12 in gives 80 cubic feet, identical to entering 40 × 2 × 1 in feet — the conversion happens before the multiplication rather than after.

Metric mode works the same way, accepting metres, centimetres or millimetres, and reports cubic metres alongside cubic feet and cubic yards. The conversion is exact: 1 foot is defined as 0.3048 metres, so a cubic yard is 0.764555 m³.

Bags or Ready-Mix?

Bag counts per cubic yard, which is where the decision becomes obvious:

Bag size Yield Per cubic yard Weight
40 lb * 0.30 ft³ 90 bags 3,600 lb
60 lb * 0.45 ft³ 60 bags 3,600 lb
80 lb 0.60 ft³ 45 bags 3,600 lb

The three yields are internally consistent: every bag size comes to 3,600 lb — 1.8 US tons — of mix per cubic yard, so the published figures agree with one another regardless of which size you buy. The 80 lb yield of 0.60 cubic feet is confirmed on the manufacturer's product data; the 40 lb and 60 lb figures marked * are the widely published values but were not traceable to a manufacturer data sheet, so the yield printed on the bag should take precedence.

That weight figure settles most decisions. Below roughly a cubic yard, ready-mix suppliers generally bill a minimum load and may add a short-load charge, so bagging is often cheaper. Above two or three yards it stops being realistic: the 5.5 cubic yard pour in Example 2 is 248 bags, nearly 10 US tons to carry, open and mix. Minimum loads and short-load fees vary by supplier, so both are worth a phone call before ordering.

What the Waste Factor Covers

On the 135 cubic foot pour from Example 2:

Waste Cubic feet Cubic yards 80 lb bags
0% 135.05.000 225
5% 141.85.250 237
10% 148.5 5.500 248
15% 155.35.750 259

The allowance covers spillage, what stays in the chute or the mixer drum, formwork that bulges slightly outward under the weight of the pour, and over-excavation where the trench came out wider than specified. Reinforcement works the other way, displacing a little concrete. Footings sit at the low end of the usual range — 5–10% rather than the larger allowance a slab wants — because a trench is a contained pour. Running short mid-pour is the expensive failure here, so the allowance is worth having.

Example Calculations

A single pad, a group of ten, and a continuous run:

Example 1 — A Single Pad Footing

4 ft × 2 ft × 1 ft, one footing, no waste allowance.

Volume = 4 × 2 × 1 = 8 cubic feet

Cubic yards = 8 ÷ 27 = 0.2963 yd³

Rounded for display that is 0.30 yd³

The exact value is 8/27, which never divides evenly

At 0.30 yd³ this is far below any ready-mix minimum load

14 × 80 lb bags covers it — a bag job, not a truck job

Example 2 — Ten Identical Footings

3 ft × 3 ft × 1.5 ft, ten footings, 10% waste.

Per footing = 3 × 3 × 1.5 = 13.5 cubic feet

Total = 13.5 × 10 = 135 cubic feet

Cubic yards = 135 ÷ 27 = 5.0 yd³ exactly

With 10% waste = 5.0 × 1.10 = 5.5 yd³

Both figures are exact — 135 is a whole multiple of 27

Ready-mix territory: 248 × 80 lb bags would be 9.9 US tons

Example 3 — A Continuous Strip Footing

40 ft total run × 2 ft × 1 ft, entered as one length.

Volume = 40 × 2 × 1 = 80 cubic feet

Cubic yards = 80 ÷ 27 = 2.9630 yd³

Often quoted as 3.0 yd³, which overstates it by 1.25%

That round-up is smaller than any waste factor

Same roof entered as 40 ft × 24 in × 12 in gives 80 cu ft too

A continuous footing is one run, not several segments

Before You Pour

Take the footing dimensions from the plans rather than from the trench. Width, depth and reinforcement follow from the soil bearing capacity, the load carried from above and the local frost depth, and none of those is a geometry question a calculator can answer — if the plans do not specify a footing, that is the gap to close first, not a number to estimate. Then measure the trench as actually dug, because over-excavation is poured as concrete whether it was intended or not, and a trench that came out two inches wide over a 40 ft run is most of a quarter yard. Footings of different sizes need working out separately and adding, since an average size times a count is not the same volume. Order against the with-waste figure, rounded up to the next quarter yard, and confirm the supplier's minimum load and short-load charge beforehand — on small pours those can dominate the concrete cost. If you are mixing from bags, check the yield printed on the bag against the figures used here, and bear in mind that the practical limit arrives earlier than the arithmetic suggests: a couple of cubic yards is already several tons of material to move by hand. This calculates volume only, and is not a substitute for a footing design.

Frequently Asked Questions

How do you calculate concrete for footings?
Multiply length by width by depth to get cubic feet, then divide by 27 for cubic yards. A 4 ft × 2 ft × 1 ft footing is 8 cubic feet, which is 8 ÷ 27 = 0.2963 cubic yards. For several identical footings, multiply the volume of one by the count, then add a waste allowance of 5–10%.
How many cubic feet are in a cubic yard?
Exactly 27. A yard is three feet, and a cubic yard is a three-foot cube, so 3 × 3 × 3 = 27 cubic feet. That is why every footing volume in cubic feet gets divided by 27 to reach the figure concrete is actually sold by.
How much concrete do I need for 10 footings?
Work out one footing and multiply. Ten footings at 3 ft × 3 ft × 1.5 ft are 13.5 cubic feet each, so 135 cubic feet in total, which is exactly 5.0 cubic yards. With a 10% waste allowance that comes to 5.5 cubic yards. This only holds if the footings are genuinely identical — mixed sizes must be calculated separately and added.
What waste factor should I use for concrete footings?
5–10% is the usual range, and 10% is a safe default. Footings waste less than slabs because they are a contained pour, but the allowance still covers spillage, what stays in the chute or mixer, formwork that bulges slightly under the pour, and the concrete displaced by reinforcement. On a 5.0 cubic yard pour, 10% adds half a yard.
How many bags of concrete do I need for a footing?
Divide the volume in cubic feet by the bag yield and round up. An 80 lb bag yields 0.60 cubic feet, so an 8 cubic foot footing needs 14 bags. A useful check: every bag size works out to 3,600 lb — 1.8 US tons — of mix per cubic yard, which is 45 × 80 lb, 60 × 60 lb or 90 × 40 lb bags.
Should I use bagged concrete or ready-mix for footings?
It turns on volume. Below about a cubic yard, ready-mix suppliers generally bill a minimum load and may add a short-load charge, so bagged mix often wins. Above two or three cubic yards, bagging becomes impractical — a 5.5 cubic yard pour is 248 × 80 lb bags, nearly 10 US tons to move and mix by hand. Get the minimum load and any short-load fee from your local supplier, since both vary.
Why is my footing volume not a round number of yards?
Because 27 rarely divides evenly into a footing volume. An 8 cubic foot footing is 0.2963 cubic yards and an 80 cubic foot run is 2.9630 — neither terminates. Volumes here are reported as calculated rather than rounded up, since the fractional yard is real concrete. Ready-mix is normally sold in quarter-yard increments, so the order quantity will be the next quarter yard above the figure shown.
Does this calculator size the footing for me?
No — it calculates volume only. Footing width, depth and reinforcement follow from the bearing capacity of the soil, the load carried from the structure above and the local frost depth. Those are engineering decisions rather than geometry, and they belong on the plans before any volume is worked out.

Assumptions & Reference Values

This tool returns estimates using standard trade formulas and the default values shown in the calculator inputs. Real quantities depend on site conditions, product dimensions, and waste, so allow extra when ordering.

Calculator Defaults:

  • Volume (cubic feet) = length × width × depth. Volume (cubic yards) = cubic feet ÷ 27. Total = volume per footing × number of footings. Total with waste = total × (1 + waste ÷ 100). A cubic yard is 27 cubic feet because a yard is three feet and 3 × 3 × 3 = 27.
  • Each dimension carries its own unit, because mixed units are the norm for footings rather than the exception: a continuous footing is commonly 40 ft long but 24 in wide and 12 in deep. Conversion to a single base unit happens before the multiplication, so 40 ft × 24 in × 12 in gives 80 cubic feet, identical to entering 40 × 2 × 1 in feet.
  • Volumes are reported as calculated, not rounded up, because concrete is a continuous material and the fractional yard is real. They are also not pre-rounded to a fixed number of decimal places: doing so creates half-way values that then display the wrong way, since 8.8250002 snapped to 8.825 renders as 8.82 where the true value renders as 8.83. That was measured at 52 cases per million at two decimal places, so all rounding is left to the display layer and the step-by-step reconciles with the totals exactly.
  • Bag counts ARE rounded up, since a bag cannot be split, using a 1e-9 snap before the ceiling so that a volume landing a float-hair above a whole bag does not gain a phantom one. The snap is load-bearing: of 9,000 exact-multiple volumes tested, 1,468 would have gained a spurious bag without it.
  • Bag yields are 40 lb = 0.30 cu ft, 60 lb = 0.45 cu ft and 80 lb = 0.60 cu ft. Only the 80 lb figure was traceable to manufacturer product data; the other two are the widely published values but were not found on a manufacturer data sheet, so the yield printed on the bag should take precedence. The three are internally consistent — each works out to 3,600 lb, or 1.8 US tons, of mix per cubic yard (45 × 80 lb, 60 × 60 lb or 90 × 40 lb).
  • The spec examples are approximations and the engine is faithful to them rather than to their rounded figures. 8 cubic feet is 0.2963 cubic yards, stated in the brief as 0.30; 80 cubic feet is 2.9630, stated as 3.0, which overstates the true volume by 1.25% — less than any waste factor. Example 2 is the only one that divides evenly: 135 cubic feet is exactly 5.0 cubic yards, and 5.0 × 1.10 is exactly 5.5.
  • A 5–10% waste allowance is the usual range for footings, lower than a slab wants because a trench is a contained pour. It covers spillage, what stays in the chute or mixer drum, formwork that bulges outward under the weight of the pour, and over-excavation where the trench came out wider than specified. Reinforcement works the other way, displacing a little concrete.
  • Warnings fire on four conditions. A footing many times longer than it is wide while the count is above one usually means a continuous run has been entered as segments. A depth under 6 inches is below common minimum thicknesses and may be a slab figure. A waste allowance above 25% is high for footings. And a pour under one cubic yard is flagged because ready-mix suppliers generally bill a minimum load with a possible short-load charge, so bagged mix may be cheaper.
  • The hand-mixing warning is set at 150 bags, roughly 3.3 cubic yards or 6 US tons, rather than at a lower figure. A 60-bag line would sit at only 1.33 cubic yards and so fire on almost every real footing pour, carrying no information.
  • This calculates volume only and does not size a footing. Width, depth and reinforcement follow from the soil bearing capacity, the load carried from the structure above and the local frost depth, which are engineering decisions rather than geometry. Ready-mix minimum loads and short-load fees vary by supplier and were not reducible to a single figure, so they are flagged rather than estimated.

Disclaimer

Estimates are for planning only. Check local building codes and manufacturer specifications, and consult a licensed contractor or engineer for structural, electrical, or other safety-critical work.

Built and maintained by Smitesh Pednekar. See how calculators are checked. Found an error? Let me know.